Work location
Hangar ,Donmuang Office
Education
Certificate
Mandatory requirement English TOEIC minimum score 400
Work Experience
Job Purpose (Accountability)
- Preparation required Heavy Maintenances’ resources included spare part and tooling prior to the aircraft has entered to its Heavy Maintenance Visit, in order to ensure the safe completion of the maintenance work and to minimize the aircraft’s downtime and to avoid delay, and planning of maintenance tasks by cooperate with heavy maintenance production team and to take into account human performance limitations.
Duties / Responsibilities
1.Carry out all concerned duties regarding Quality, Safety and Security required by the company.
2. Co-ordinate with all concerned divisions in Base Maintenance for review Major Scheduled plan of check to achieve on time competition of check.
3. Co-ordinate with Technical Planning and Record Division (hereinafter referred to as the “EP”) and other concerned in Base Maintenance to input long term hangar visit plan base on Scheduled check, applicable Airworthiness Directives/Mandatory Modification, Major Item Change.
4. Co-ordinate with EP to review work scope for incoming aircraft visit hangar and organize meeting with concerned divisions in Base maintenance two months in advance before aircraft visit hangar.
5. Co-ordinate with Engineering (hereinafter referred to as the “EE”)/Power Plant (hereinafter referred to as the “ET”) to ensure Airworthiness Directives (ADs) and Service Bulletins (SBs) maintenance tasks have Engineering Orders (EOs) or other approved maintenance data and/or any Engineering/Power Plants’ supports.
6. Co-ordinate with incoming aircraft visit hangar and organize meeting with concerned divisions in Base maintenance two months in advance before aircraft visit hangar to receive approved maintenance data.
7. Co-ordinate with Purchasing & Repair to ensure all necessary tools, equipment and material are available.
8) Co-ordinate with Store to ensure all necessary calibration tools are calibrated and available.
9. Liaison with Heavy Maintenance Crew Chief to organize his Heavy Maintenance staff versus prepared daily maintenance tasks in order to take into account human performance limitations.
10.Review work scope to ensure that efficient process are in pace for Routine/Non-Routine task for part, material preloaded in a timely manner for effective schedule of work.
11. Monitor and issue daily status report on work process of check and highlight any significant deviations from plan.
12. Arranges assistance including working parties from local repair agency for carry out Unscheduled/Scheduled work during check for which capability not available in PG facility.
13. Coordinate with Heavy Maintenance team and other concerned division develop and improve system and work practical of division to increase efficiency and productivity.
14. Colletion all of maintenance task return from Heavy Miantenance production team completed signed off and completed attached required approved data as per heanvy maintenance standard operation procedure before send to Technical Record & Planning Division.